BRINGING
THE NEXT
GENERATION
OF MINES TO
BURKINA FASO

Download Project Map

Sanutura Project

  • 1,454km² and 100% owned in prolific Southern Houndé Belt
  • Hosts the 0.6Moz indicated + 2.3 Moz Au inferred Mineral Resource Tankoro Deposit
  • Significant exploration upside
  • Visibility to mine development
Learn More

Karankasso Project

  • Covers 750km²
  • Operated as a joint venture
  • Proximal to Sarama’s Sanutura Project
Learn More

Koumandara Project

  • Highly prospective, 600km² and 100% owned, situated 80km west of the South Houndé Project
  • Multiple gold corridors, the largest being 43km x 10km
  • The most prospective corridor overlies a 45km-long section of a district-scale litho-structural break
  • Soil geochemical surveys and auger and scout drilling have all delivered excellent high-grade results
Learn More